User Tools

Site Tools


student_documentation:quickstart

This is an old revision of the document!


Quick Start Guide

1. OBC Pod mounting
The mounting hole is drilled for OBC to have 90° Field of View to the sky

2. Backbone installation
The Backbone is placed so that 10cm cable can be pulled out of the shaft. Allow for 3 - 4 inches calbel lift available (A “fist” in between)

3. OBC Battery Charging & Mounting
Battery needs to be charged!

4. Liquid Flowmeter installation

5. Shutdown Relay wired

6. Quick check before inspection

This website uses cookies. By using the website, you agree with storing cookies on your computer. Also you acknowledge that you have read and understand our Privacy Policy. If you do not agree leave the website.More information about cookies
Log In (for D&T Team and Volunteers ONLY) student_documentation/quickstart.1613066180.txt.gz · Last modified: 2021/02/11 17:56 by 127.0.0.1